taylor_lab
TaylorLab_Gantt
TaylorLabMap

This Lab Map highlights the diverse paths individuals have taken before joining the Taylor Lab at Fred Hutch in Seattle, WA (2014-2023) or UVA in Charlottesville, VA (2023-now). 15 countries, 26 US states, and one US territory are pinned so far.



Justin Taylor
Justin Taylor, PhD, (he/him)
Principal Investigator

Associate Professor, Division of Infectious Diseases & International Health
Member, Beirne B. Carter Immunology Center
Department of Medicine
LinkedIn

Dr. Justin Taylor is an immunologist who focuses his research on B cells, a type of white blood cell responsible for producing immune proteins called antibodies. Dr. Taylor received his BS from Rider University in 2002 and was introduced to immunological research during his time there. Dr. Taylor went on complete his PhD in Immunology from the University of Pennsylvania in 2008 studying T cell responses to parasitic helminth infections. As a postdoctoral fellow at the University of Minnesota beginning in 2009, Dr. Taylor built upon these experiences and developed research projects analyzing B cells. Dr. Taylor helped develop innovative strategies to find rare B cells specific for antigens of interest, work that led Dr. Taylor to start his own lab at Fred Hutchinson Cancer Center in 2014 with the goal of dissecting B cell responses in human infectious diseases and cancer. In parallel, Dr. Taylor’s lab has also developed a robust platform for engineering B cells to produce protective or therapeutic antibodies and is working to bring these approaches to the clinic to prevent or treat disease. Together, the Taylor lab has built a robust program for interrogating and modifying B cells with the goal of improving human health.

When not working he enjoys traveling, home repair & improvement, baseball, and spending quality time with friends & family.


Professional Research Staff


Kuntal Biswas
Kuntal Biswas, PhD, (he/him)
Senior Research Scientist for the Taylor and the Anderson Labs

09/2024 – present
LinkedIn

Kuntal received his Ph.D. in Cardiovascular Physiology from the University of Kanazawa, Japan in 2013. His graduate works mainly focused on the role of class II PI3K C2a in the cardiovascular system both in vitro and in vivo. He started his postdoc in Dr. James Larner's lab in Radiation Oncology at the University of Virginia where he studied E3 ligase, Carboxyl terminus of Hsp70- Interacting Protein70 (CHIP) in prostate cancer. He joined Gynecology Oncology as a Senior Scientist in 2021 where he is exploring RNA Polymerase I inhibitor, CX-5461 in chemo-resistant ovarian cancer cells. In the Taylor Lab, Kuntal is focused on understanding and manipulating B cell responses to cancer.

Outside the lab, Kuntal loves gardening, cooking, visiting new places, and spending quality time with his family.


Kara Cummings
Kara Cummings, PhD, (she/her)
Lab Manager for the Taylor and the Anderson Labs

Undergraduate Training Program Coordinator for the Taylor and Anderson Labs
Lab Safety Officer for the Taylor and Anderson Labs
08/2023-Present

Dr. Cummings received her PhD in Cellular Biology from the University of Georgia in the lab of Dr. Rick Tarleton. During her graduate work, she investigated the role of iNOS signaling during Trypanosoma cruzi infections. She completed her post-doctoral training under the mentorship of Dr. Young Hahn at the University of Virginia, where she studied CD4 T cell responses to hepatitis C virus (HCV) infections. She joins the Anderson and Justin Taylor labs from Dr. Vic Engelhard’s lab, where she was a Senior Lab Specialist. Her research in the Engelhard lab focused on the immunogenicity of cancer-expressed phosphorylated MHC Class I peptides. In the Anderson Lab, Kara aims to apply her cancer immunology training to investigate immune responses in solid tumors and develop novel immune-based cancer therapeutics. She also oversees the lab’s undergraduate research program.

In her free time, she enjoys reading suspense novels.


Fellows


Sunil Palani
Sunil Palani, PhD, (he/him/his)
Postdoctoral Research Scientist

07/2024 – Present
LinkedIn

Dr. Sunil Palani is an immunologist and received his Ph.D. in Immunology and Microbiology from the University of Texas Medical Branch Galveston in the lab of Dr. Keer Sun, where he investigated the role of Alveolar macrophages in pulmonary infections and the interplay between Type I and Type II IFNs on antibacterial immunity during influenza-induced pneumococcal pneumonia. Immunology has always been his favorite subject since his undergrad. He graduated with a Bachelor of Engineering in Biotechnology in 2014 from M S Ramaiah Institute of Technology, Karnataka, India. His love for immunology and microbiology led him to pursue a master’s degree in medical biotechnology from the University of Illinois at Chicago, where he studied the cellular mechanisms in B-1 cells in response to an immunization strategy termed “suppressed immunization,” a therapeutic strategy to treat autoimmune diseases. Shortly after graduation, he moved to Boston and briefly worked for a biotech company before moving to Takeda Vaccines Inc. At Takeda, he was involved in determining Dengue vaccine efficacy in patient samples using the RVP-based serotype-specific neutralization assay. In Taylor lab, he will study the mechanism underlying B cell tolerance breakdown during infections and autoimmunity.

Dr. Palani enjoys cooking and finds it therapeutic. Outside the lab, he loves interior designing, gardening, and spending time with family and friends.


Haroldo Rodriguez Chevez
Haroldo Rodriguez Chevez, PhD, (he/him)
Postdoctoral Research Associate

12/2025 - Present
Immunology T32 AI007496 Training Program: 2026 - present
University of Washington Graduate Student in Taylor and Nghiem Labs
01/2021 - 12/2025
LinkedIn

Dr. Rodriguez was a Molecular Medicine and Mechanisms of Disease (M3D) PhD student at the University of Washington in Seattle. He was jointly mentored by Drs. Paul Nghiem at UW and Justin Taylor at Fred Hutch Cancer Center and relocated to the University of Virginia after the Taylor lab relocated to continue his studies on characterizing cancer-specific B cell responses in Merkel Cell Carcinoma (MCC). MCC is a rare and aggressive skin cancer that is primarily driven by integration and truncation of the Merkel Cell Polyomavirus (MCPyV) DNA into a host cell chromosome. This leads to expression of viral oncoproteins that are recognized by adaptive immune responses, enabling studies on cancer-specific immunity across MCC patients. As a graduate student, Dr. Rodriguez focused on leveraging flow cytometry and single cell proteomic and transcriptomic approaches to untangle the complex web of B cell responses that may modulate tumor-specific immunity. After obtaining his PhD, Haroldo is shifting focus to mechanistic studies of B cell responses during cancer using animal models. Additionally, Haroldo is passionate about mentoring and training the next generation of scientists and has worked with multiple undergraduate students during his PhD years.

In his free time, Haroldo enjoys runs/hikes with his 6-year-old doggo, (badly) playing tennis, drinking craft beer, and hanging out with family and friends.


Alex Say
Alex Say, MD, (he/him)
Infectious Disease Fellow

07/2025 - Present
Infectious Disease T32 AI007046 Training Program: 2025 - present
LinkedIn

Dr. Say is an Infectious Disease fellow at UVA. He earned his undergraduate degree at Louisiana Tech University, where he researched Candida albicans drug resistance in the Hindmarsh lab. He went on to receive his MD from the LSU School of Medicine in New Orleans. He completed his internal medicine residency at LSU in Baton Rouge, where he received several awards for medical student education and was selected as Chief Resident. In the Taylor lab, Dr. Say is studying the memory B cell response to pneumococcal polysaccharides, particularly in patients with HIV and older adults.

Outside the lab, Alex enjoys cooking, discovering new music, spending time with friends, and being outdoors—most recently hiking, sailing, and canoeing.


Graduate Students


Julia Blaszczyk
Julia Blaszczyk, MS

02/2025 - Present
LinkedIn

Julia Blaszczyk completed her bachelor's and master's degrees in medical biotechnology at Pomeranian Medical University in Poland. During her undergraduate studies under the Erasmus Exchange Program, she participated at the Inland Norway University of Applied Sciences in a research project that focused on the development of a melting curve-based, multiplex single nucleotide extension method called Liquid Array Diagnostics technology for genotyping single nucleotide polymorphisms and its application to the detection of selected HPV variants associated with human pathology. She completed her bachelor's degree with a thesis on the importance of predictive models and universal tests in identifying Lynch syndrome. During her master’s studies, she participated in diagnostic genetic testing for cancer and targeted therapy projects during a one-year research internship at the Read-Gene company, and she evaluated the association of USP39 gene mutations with prostate cancer risk. Julia next completed a two-year research internship in the BioLab Program under a Fulbright Scholarship at UVA School of Medicine in Prof. David Wotton's Laboratory researching the interaction of metabolic and epigenetic control in colorectal cancer. Fascinated by the clinical potential of cancer immunology and immune cell engineering, she joined the BIMS PhD program and is studying B cell responses in ovarian cancer with and without immunotherapy.

Outside the lab, she enjoys singing, hiking, skiing, tennis and traveling.


Darlene Malavé Ramos
Darlene Malavé Ramos, MS, (she/her)

02/2024 - Present
Biotechnology for Human Health T32 GM136615 Training Program: 2026 - present

Darlene Malavé Ramos received her B.S. in Industrial Microbiology from the University of Puerto Rico at Mayagüez. Her undergraduate research focused on identifying and characterizing tetracycline-resistant bio-prospects in Caracolus marinella’s gut and Guánica’s Dry Forest metagenomic libraries. She joined the BIMS PhD program in 2023 and her work in the Taylor lab focuses on engineering B cells to potently protect against respiratory virus infections.

Outside the lab she likes to spend time with friends, watch TV, and play sports.


Vignesh Senthilkumar
Vignesh Senthilkumar, MS

04/2025 - Present
Infectious Disease T32 AI007046 Training Program: 2026 - present
LinkedIn

Vignesh Senthilkumar is an MD/PhD student in the UVA Medical Scientist Training Program. Originally from Southern California, he received his B.S. in Microbiology, Immunology, and Molecular Genetics and a minor in History from UCLA. His undergraduate research primarily focused on inborn errors of immunity in NK cells. He stayed at UCLA for his gap year, investigating protein-protein interaction in the parasite Toxoplasma gondii. In the Taylor Lab, Vignesh is interested in post-infection auto-immunity, particularly anti-interferon antibodies produced after respiratory illnesses.

Outside of the lab, Vignesh is heavily involved with health policy, holding leadership positions in the student sections of both the Medical Society of Virginia and the American Medical Association. He also enjoys playing soccer and basketball, and exploring the great outdoors.


Seb Wang
Seb Wang, MS, (he/him)

01/2024 - Present

Seb Wang is a BIMS PhD student. He received his B.S. in Philosophy as well as Microbiology from the University of Pittsburgh and ScM in Molecular Microbiology and Immunology from Johns Hopkins University. During his master’s program, he investigated the cytokine-secreting mechanism of plasmacytoid dendritic cells which can implicate autoimmune diseases like lupus. In the Taylor Lab, he is working on engineering B cells to secrete high titers of neutralizing antibodies against respiratory viruses. In addition, he is also particularly interested in the philosophy of science which he believes can help scientists investigate their interest more efficiently.

Outside of the lab, he likes cooking, biking, and gaming.


Other Contributors


Gabriel Alencar
Gabriel Alencar, PhD, (he/him)
Sr. Bioinformatics/Computational Biologist

08/2023-Present
LinkedIn

Dr. Alencar received his PhD in Biochemistry and Molecular Genetics from the University of Virginia under the mentorship of Dr. Gary Owens and Dr. Stefan Bekiranov. During his graduate work and for a couple of years thereafter, he used bioinformatic tools to interrogate the role of pluripotency genes in smooth muscle cells late-stage atherosclerosis. During his training, he mastered coding languages Python, JavaScript, HTML, Perl, and R, built pipelines for scRNA-seq, bulk RNA-seq and ChIP-seq analyses, and designed software for data visualization. He worked at Tandem Diabetes Care as a Senior Customer Experience Researcher role where he designed studies and performed data analysis, i.e. comparing diabetic patients (type 1 and type 2) glycemic control improvement, as well as several quality of life parameters, after being in a insulin pump for a year. Worked in a co-mentored position in the Taylor and Anderson labs in 2023 but shifted his position to one supporting several other labs beginning in 2025.

When he's not sciencing, Dr. Alencar is a proud parent to two awesome boys. And when he's got some free time on his hands, you'll find him geeking out over everything cool, grooving to music, and wandering around the region soaking in the great outdoors (and indoors).


Abdulrahman Asy
Abdulrahman Asy
Undergraduate in the Anderson Lab

Abdulrahman Asy is a Fourth Year biology student at UVA. His interest in cancer research was sparked by his personal experience undergoing treatment for Hodgkin's lymphoma and Nasopharyngeal carcinoma. Driven by a desire to make an impact in those similarly affected, he aspires to pursue a degree in biomedical sciences, aiming to support and improve outcomes for individuals facing cancer recurrences and treatment resistance. In his free time Abdul likes to workout, cook, read, and spend time with family and friends.


Daniel Dapaah
Daniel Dapaah
Undergraduate in the Anderson Lab

Daniel Dapaah is a Fourth Year at UVA. His initial desire to participate in medical research began a few years ago when one of his family members struggled with an unknown skin condition. His family member went from doctor to doctor, and none could identify the cause of his suffering. Seeing his family member struggle was challenging and inspired Daniel pursue the medical field. In his free time, he enjoys spending time outside admiring nature, traveling with friends and family, watching movies, and playing basketball!


Caroline Grant
Caroline Grant
Undergraduate in the Anderson Lab

Caroline Grant is a Fourth Year at UVA. In middle school, she received an at-home chemistry kit for Christmas and began performing small experiments with her dad after school. Over the following years, she became increasingly interested in science because it offered an intuitive way for her to answer her own burning questions about the natural world. By the time she entered high school, she knew she was passionate about biology and chemistry, and she was fortunate enough to participate in a wonderful biomedical research experience that further cemented her interest in medical research. In her free time, she enjoys playing the piano, running, taking her yellow lab for walks, and spending time with her family!


Lizzie Mangilit
Lizzie Mangilit
Undergraduate in the Anderson Lab

Lizzie Mangilit is a Fourth Year at UVA. She was inspired to pursue biomedical research because of a family history with eczema. Going to countless dermatologist visits sparked her curiosity for immunology and inspired her to pursue a career in medicine to help others struggling with stubborn medical conditions. She excited to pursue her interest in immunology at the Anderson Lab! In her free time, she enjoys hanging out with friends, dancing, drawing, and trying new restaurants.


Samara Tanner
Samara Tanner
Undergraduate in the Anderson Lab

Samara Tanner is a Fourth Year at UVA. She has been interested in science for as long as she can remember and particularly enjoys studying biology to understand the mechanisms by which the body functions. Taking an immunology course at UVA inspired her to learn more about how translational research can advance medicine and contribute to the development of new therapeutics, which she hopes she will be able to apply in her future pursuit of medical research. In her free time, she enjoys lifting weights, backpacking, and watching basketball, football, and hockey.


Other Contributors - Cast


Paul Orange
Paul Orange
Chief Operating Officer

Paul joined the University of Virginia in 2002 and currently serves as the Chief Operating Officer for the Robert M. Berne Cardiovascular Research Center and Beirne B. Carter Immunology Center, where he manages 20 research laboratories occupying 45,000+ sq ft and that employs over 250 faculty, staff, students, and volunteers.

Paul provides management and oversight for over $35 million annually in research support, as well as endowments and investments in excess of $40 million. Together with the Center Directors, Paul is responsible for ensuring sound financial practices within the Centers and is principally responsible for the leadership and oversight of information systems, human resources, research administration, building facilities management, and Center personnel.


Christos Baryiames
Christos Baryiames
Program and Communications Manager

Christos Baryiames, PhD, holds a doctorate in biophysics from the University of Texas at Ausin. He administers the Immunology Training Program and assists with management of the Cardiovascular Training Program. He is also responsible for publicizing the Center's successes and is a specialist in science communication. Christos is a resource for the Center in all communication-related areas, including photography, resume & CV review, and presentation preparation.


Scott Chappell
Scott Chappell
IT Support Manager


Jessica Gallimore
Jessica Gallimore
CIC Front Office Manager


Darlene Rieckmann-Larosa
Darlene Rieckmann-Larosa
Senior Finance Administrator


Amber Thacker
Amber Thacker
Grants and Contracts Administrator



Former Lab Members

Monica Rodrigues, PhD, (she/her)
11/2023 - 08/2026
Title: Postdoctoral Research Scientist
LinkedIn

Ashraf Yousif, PhD
06/2024 – 07/2025
Title: Senior Research Scientist
Subsequent position: Principal Investigator, King Abdullah International Medical Research Center
LinkedIn

Macy Gilmour, (she/her)
10/2023 - 05/2025
Title: Undergraduate University of Washington Undergraduate Lab Aide in the Nghiem Labs
Subsequent position: Postbac, University of Washington

Anna Buetow, (she/her)
07/2024 – 05/2025
Title: Laboratory Technician II
Subsequent position: Laboratory Technician II. University of Virginia
LinkedIn

Arianna Gravatt
03/2024 - 05/2025
Title: University of Virginia Undergraduate Student in the Taylor and Anderson Labs

Rian Alam, (he/him)
10/2023 - 05/2025
Title: Undergraduate University of Washington Undergraduate Lab Aide in the Nghiem Labs

Tina Nguyen
03/2024 - 05/2025
Title: University of Virginia Undergraduate Student in the Taylor and Anderson Labs
Subsequent position: Longwood University Master’s in speech-language pathology program

Allison Remington, (she/her)
09/2021 - 07/2024
Title: University of Washington Undergraduate Lab Aide in Taylor and Nghiem Labs
Subsequent position: Research Technician, Fred Hutchinson Cancer Center
LinkedIn

Grady Gastelum, (he/him)
10/2022 - 07/2024
Title: Postdoctoral Innovation Scholar at Fred Hutch in the Taylor
Subsequent position: Postdoc, Fred Hutchinson Cancer Center
LinkedIn

Katrina Poljakov, (she/her)
01/2022 - 07/2024
Title: Research Technician II at Fred Hutch in the Taylor and Adair labs
Subsequent position: Research Technician, Fred Hutchinson Cancer Center
LinkedIn

Ally Kong
09/2022 - 08/2023
Title: Research Technician
Subsequent position: Research Technician, Fred Hutchinson Cancer Center
LinkedIn

Elizabeth McCarthy
11/2022 - 08/2023
Title: Lab Manager for the Taylor, Lund, Prlic, and Boonyaratanakornkit labs.
LinkedIn

Francesca Urselli, MS
07/2020 - 08/2023
Title: Research Technician and Quality Assurance Manager
Subsequent position: Research Technician, Fred Hutchinson Cancer Center
LinkedIn

Kayla Hopwo
10/2020 - 08/2023
Title: Research Technician
Subsequent position: Research Technician, Fred Hutchinson Cancer Center
LinkedIn

Lea Kipnis
06/2022 - 08/2023
Title: Undergraduate Lab Aide
Subsequent position: Boonyaratanakornkit Lab, FHCC
LinkedIn

Matthew Gray, PhD
03/2020 - 08/2023
Title: Senior Staff Scientist
Subsequent position: Senior Staff Scientist, Fred Hutchinson Cancer Center
LinkedIn

Ren Ikeda
10/2022 - 05/2023
Title: Research Technician
Subsequent position: Research Technician, Fred Hutchinson Cancer Center

Molly Kanagy
10/2020 - 08/2022
Title: Research Technician
Subsequent position: Pathobiology PhD student, University of Washington
LinkedIn

Paula Culver
10/2016 - 08/2022
Title: Lab Manager for the Taylor, Lund, and Prlic labs.
LinkedIn

Jim Boonyaratanakornkit, MD, PhD
Email: jboonyar@fredhutch.org
02/2016 - 07/2022
Title: Post-Doctoral Research Fellow/Research Associate
Subsequent position: Boonyaratanakornkit Lab, FHCC
LinkedIn

Maddi Bibby
03/2021 - 07/2022
Title: Research Technician
Subsequent position: Boonyaratanakornkit Lab, FHCC
LinkedIn

Kristin Fitzpatrick
06/2018 - 06/2022
Title: Graduate Student
Subsequent position: Senior Research Associate, Mozart Therapeutics, Inc.
LinkedIn

Taylor Stepien, PhD
03/2021 - 06/2022
Title: Post-Doctoral Research Fellow
LinkedIn

Julia McKechnie, PhD
10/2020 - 05/2022
Title: Post-Doctoral Research Fellow
Subsequent position: Icosvax, Inc.
LinkedIn

Sara Romero
01/2020 - 04/2022
Title: Undergraduate Lab Aide

Jessica Schembri, MS
07/2019 - 12/2021
Title: Research Technician
Subsequent position: Research Technician, Princeton University

Madelyn Caban
07/2020 - 08/2021
Title: Post-Baccalaureate Researcher
Subsequent position: Immunology PhD student, University of Washington
LinkedIn

Erica Naibert
07/2019 - 03/2021
Title: Research Technician
Subsequent position: Umoja Biopharma
LinkedIn

Blair DeBuysscher, PhD
11/2014 - 11/2020
Title: Post-Doctoral Research Fellow/Research Associate
Subsequent position: University of Montana
Other Bio

Dillon Alwan
08/2017 - 07/2020
Title: Research Technician
Subsequent position: Dual MPH/MSUP Candidate at Columbia University
LinkedIn

Logan Mullen, MS
10/2019 - 07/2020
Title: Research Technician
Subsequent position: Genomics Core Lab Coordinator, University of Alaska Fairbanks
LinkedIn

Maggie Emerton
06/2019 - 01/2020
Title: Undergraduate Lab Aide
LinkedIn

Carson Harms, MS
10/2016 - 10/2019
Title: Research Technician
Subsequent position: Lyell Immunopharma
LinkedIn

Marti Tooley
11/2017 - 06/2019
Title: Research Technician
Subsequent position: Molecular Engineering PhD student, University of Washington
LinkedIn

Kristen Sievert
04/2018 - 03/2019
Title: Undergraduate Lab Aide
LinkedIn

Howell Moffett, PhD
01/2017 - 02/2019
Title: Post-Doctoral Research Fellow/Research Associate
Subsequent position: Outpace Bio
LinkedIn

Ali Schwartz
06/2016 - 07/2018
Title: Research Technician
Subsequent position: Recell Lead, United Therapeutics
LinkedIn

Melissa Baker
06/2017 - 07/2018
Formerly Part-time Undergraduate Lab Aide
08/2016 - 05/2017
Title: Research Technician
Subsequent position: School of Medicine, Georgetown University
LinkedIn

Tara Bancroft, PhD
11/2015 - 06/2018 (Co-Mentored by Dr. Leo Stamatatos)
Title: Post-Doctoral Research Fellow
Subsequent position: Biotechnology Equity Research Associate, Piper Jaffray
LinkedIn

Alexandria Naftchi
06/2017 - 08/2017
Title: Undergraduate Summer Intern 2017
Subsequent position: Nanostring Technologies

Rachel Van Gelder
06/2017 - 08/2017
Title: Undergraduate Summer Intern 2017
Subsequent position: Immunology Graduate Student, University of Washington
LinkedIn

Anne Macy
09/2016 - 05/2017
Title: Part-time Undergraduate Lab Aide
Subsequent position: Research Technician, University of Arizona
LinkedIn

Karen Kim
08/2015 - 12/2016
Title: Research Technician
Subsequent position: University of Queensland Medical Student
LinkedIn

Holly Steach
05/2014 - 07/2016
Title: Research Technician
Subsequent position: Immunology Graduate Student, Yale University
LinkedIn

Nicole Na
08/2014 - 05/2015
Title: Research Technician
Subsequent position: Publications & Auxiliary Studies Project Manager, HIV Vaccine Trials Network
LinkedIn

David Buchholz
2014 and 2015
Title: Undergraduate Summer Intern
Subsequent position: PhD candidate, Washington State University